Work Plan in Monitoring and Evaluation Format
 
 
To view the PDF document you require Adobe® Reader. To download the reader click here
 

     
  Flow Chart  
 
 
 
Selection of Site & Collection of Field Data
from existing concrete dam
(WTCER)
 
 
 
 
Preparation of tentative specification for
Rubber Dam based on field data
(All consortium members)
 
 
 
   
Rubber Compound
Development
(IRMRA)
 
Selection of Yarn & Spinning
methodologies
(CIRCOT)
 
Selection of Fabric Design
and its Treatment
(Kusumgar Corporates)
 
Technical Yarn Development
(CIRCOT)
Technical Fabric Development
(Kusumgar Corporates)
Rubber Composit Development
(IRMRA)
   
 
 
Modeling & Stress
Analysis of Rubber Dam
(IRMRA / WTCER)
Bulk Production of Technical  Fabric
(Kusumgar Corporates)
Development of Prototype Dam
(WTCER & IRMRA)
   
 
   
Installation of Dam
(WTCER)
 
Field / Lab Test
(WTCER / IRMRA CIRCOT)
   
Evaluation
(WTCER)
 
Approaches to Objective 1
Selection of composite materials,
development of rubber compound
& its component:
Approaches of Objective 2
Selection of site and framing of
rubber composite material:
Approaches of Objective 3
To develope and evaporate prototype
rubber dams
 
 
  To develope and evaporate prototype rubber dams :
  Lab Test set up for functional testing before field installation and Installation of prototypes in different water sheds and collection of field performance data for one complete year (one cycle of all seasons) and designing of suitable model with specified design parameters using finite element theory to evaluate the stress profile.